
Gideon Boako Applauds Roads Minister for Solving Potholes in Tano North
Introduction
Residents of Tano North in Ghana have welcomed significant progress in road infrastructure after the Member of Parliament, Dr. Gideon Boako, successfully engaged the Minister for Roads and Highways to address deteriorating road conditions. The initiative focuses on patching critical potholes across key routes in the constituency, bringing relief to commuters and local businesses alike.
Key Points
- MP Gideon Boako engaged the Roads Minister and Urban Roads Department to address deteriorating roads in Tano North
- Pothole patching works have begun on the Yamfo–Tanoso stretch
- Additional repairs planned for Duayaw Nkwanta, including Techimatia Road, Centre Road, and Market Road
- Motorists and pedestrians urged to cooperate with road contractors and observe safety measures
- The intervention follows repeated appeals to improve road safety and ease transportation in the area
Background
Tano North, located in the Ahafo Region of Ghana, has long struggled with deteriorating road infrastructure that has impacted daily life for residents and businesses. The constituency, represented by Dr. Gideon Boako, has experienced significant wear and tear on its road network due to heavy traffic and inadequate maintenance over the years.
The roads in question serve as vital arteries for economic activity, connecting farming communities to markets and facilitating the movement of goods and people. The Yamfo–Tanoso stretch, along with roads in Duayaw Nkwanta such as Techimatia Road, Centre Road, and Market Road, have been particularly affected by potholes and surface degradation.
Previous attempts to address these infrastructure challenges had met with limited success, leading to growing frustration among constituents who faced daily difficulties navigating the damaged roads. The situation not only posed safety risks but also increased vehicle maintenance costs and hindered economic productivity in the region.
Analysis
Dr. Boako’s successful engagement with the Roads Minister and the Department of Urban Roads represents a significant breakthrough in addressing long-standing infrastructure challenges in Tano North. This development highlights the importance of effective representation and persistent advocacy in securing government attention for local development needs.
The decision to begin repairs on the Yamfo–Tanoso stretch suggests a strategic approach to addressing the most critical infrastructure needs first. This stretch likely serves as a major transportation corridor, and its rehabilitation will have immediate positive impacts on traffic flow and safety for a large number of road users.
The inclusion of Duayaw Nkwanta roads in the repair plan demonstrates a comprehensive approach to addressing infrastructure needs across the entire constituency. By targeting multiple key routes simultaneously, the intervention aims to create a more cohesive and functional road network that benefits the entire community.
The emphasis on public safety and cooperation during the repair works reflects an understanding of the potential disruptions that road maintenance can cause. By proactively addressing these concerns and calling for public cooperation, the authorities are working to minimize inconvenience while maximizing the effectiveness of the repair works.
Practical Advice
For residents and road users in Tano North during the repair period:
1. **Plan alternative routes** when possible, especially during peak hours when repair activities may cause delays
2. **Follow all signage and instructions** from road workers and traffic management personnel
3. **Reduce speed** in construction zones to ensure safety for both workers and motorists
4. **Stay informed** about the progress of repairs through local announcements and social media updates
5. **Report any issues** or concerns to the appropriate authorities to ensure smooth implementation of the works
For local businesses affected by the repairs:
1. **Communicate with customers** about potential access issues and alternative routes
2. **Consider adjusting operating hours** if necessary to accommodate construction schedules
3. **Work with local authorities** to ensure business access is maintained where possible
4. **Plan for potential supply chain disruptions** and make necessary arrangements
FAQ
**Q: Which roads are being repaired in Tano North?**
A: The repairs will focus on the Yamfo–Tanoso stretch initially, followed by roads in Duayaw Nkwanta including Techimatia Road, Centre Road, and Market Road.
**Q: When did the repair works begin?**
A: According to reports, the intervention was announced on January 31, with works expected to commence shortly thereafter.
**Q: Who is responsible for carrying out the repairs?**
A: The Department of Urban Roads, working under the supervision of the Minister for Roads and Highways, is responsible for the repair works.
**Q: How long will the repair works take?**
A: Specific timelines have not been provided, but the scope of work suggests the project will take several weeks to complete.
**Q: Will there be any disruptions to traffic during the repairs?**
A: Yes, some disruptions are expected. Motorists are advised to cooperate with road contractors and observe all public safety measures during the repair period.
Conclusion
The initiative to repair deteriorating roads in Tano North represents a significant victory for the constituency and demonstrates the impact of effective political representation. Dr. Gideon Boako’s successful engagement with the Roads Minister and the Department of Urban Roads has secured much-needed infrastructure improvements that will benefit thousands of residents and businesses in the area.
The comprehensive approach to addressing multiple key routes simultaneously shows a commitment to creating a more functional and safe road network throughout Tano North. While some temporary inconveniences may occur during the repair works, the long-term benefits of improved road safety, reduced vehicle maintenance costs, and enhanced economic productivity will far outweigh these short-term challenges.
This development serves as a reminder of the importance of persistent advocacy and effective communication between elected representatives and government agencies in addressing local development needs. As the repair works progress, continued cooperation between authorities, contractors, and the public will be essential to ensure their successful completion and maximize their positive impact on the community.
Sources
– Life Pulse Daily. “Gideon Boako applauds Roads Minister for solving potholes in Tano North.” Published January 30, 2026. Accessed February 1, 2026.
– Ghana Ministry of Roads and Highways official communications
– Tano North District Assembly records on infrastructure needs
– Local media reports on road conditions in the Ahafo Region
*Note: This article is based on publicly available information and official statements. For the most current updates on the road repair works, please consult local authorities and official government channels.*
Leave a comment